Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25E00028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25E00028","CONST./REHAB. OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS- CONST. OF FLOOD CONTROL STRUCTURE WITH ESPLANADE ALONG POLA RIVER, BRGY. LUMANGBAYAN SECTION (DOWNSTREAM/LS), STA. CRUZ, OCC. MINDORO","GAA 2025 OO-2","On-Going",230999769.83,0,60.32,"MIMAROPA Region","MIMAROPA Region","D.T. RECIO INCORPORATED (44927)","2025-02-15",null,2025,"Regular Infra - GAA 2025 OO-2",13.06048,120.74533,"1705111000","1705100000"]
SHA-256
f9995b7d89dff8807b55aa5524e6efac2475489cda22b59582c130a4c9f2578f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.