Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25E00055

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25E00055","CONST./MAINT. OF FLOOD MITIGATION SRTRUCTURES AND DRAINAGE SYSTEM- CONST. OF ROAD DIKE ALONG BUCAYAO RIVER, PJHASE 2, BRGY. MULAWIMN, NAUJAN, ORINTAL MINORO","GAA 2025 OO-2","On-Going",137919875.02,0,93.11,"MIMAROPA Region","MIMAROPA Region","ADSL CONSTRUCTION & TRADING (48245)","2025-02-15",null,2025,"Regular Infra - GAA 2025 OO-2",13.23856,121.14408,"1705208000","1705200000"]
SHA-256
ce706ff1fac69ba4a31689f6eebddd238dc03652a747c96ac9ad25f7653e01fb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.