Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EH0019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EH0019","CONSTRUCTION OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY TULAY, ODIONGAN, ROMBLON","GAA 2025 SSP","Completed",9798140.66,0,100,"Romblon DEO","MIMAROPA Region","R N V CONSTRUCTION (12570)","2025-03-24","2025-09-19",2025,"Regular Infra - GAA 2025 SSP",12.38222,121.98826,"1705909000","1705900000"]
SHA-256
2034e7918a0733c210e45bd0fb88843ab12bed1bfa1e29fe15b821e39b7c767b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.