Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EH0059

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EH0059","CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE BUILDING (COVERED COURT), BARANGAY TUMINGAD, ODIONGAN, ROMBLON","GAA 2025 SSP","Completed",4892675.12,0,100,"Romblon DEO","MIMAROPA Region","R N V CONSTRUCTION (12570)","2025-03-24","2025-07-21",2025,"Regular Infra - GAA 2025 SSP",12.43833,122.00835,"1705909000","1705900000"]
SHA-256
422796ce86a98ae93c48bf350b13600405b7ef604d7792f7032d564439738ce7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.