Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25EI0029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25EI0029","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF BONGABONG RIVER CONTROL STRUCTURE, BARANGAY SAN JOSE SECTION, BONGABONG, ORIENTAL MINDORO","GAA 2025 OO-2","Completed",29082228.74,0,100,"Southern Mindoro DEO","MIMAROPA Region","BANAYAD CONSTRUCTION SERVICES (51462)","2025-03-11","2025-06-20",2025,"Regular Infra - GAA 2025 OO-2",12.66847,121.44335,"1705203000","1705200000"]
SHA-256
52969a8c41454bbc718949451f691f6a75fc74b3f644d49035bda1dc54a75b50

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.