Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25FB0020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25FB0020","BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES - CONSTRUCTION OF LAHAR MITIGATION DIKE ALONG BUDIAO-MIISI RIVER, PACKAGE 2, BARANGAY BUDIAO AND BARANGAY MIISI, DARAGA, ALBAY","Flood Control and Drainage","On-Going",48017564.54,0,81.18,"Albay 2nd DEO","Region V","NEXT GENERATION CONSTRUCTION AND SUPPLY CORPORATION (40088)","2025-03-05",null,2025,"Regular Infra - GAA 2025 SSP",13.20851,123.69029,"500503000","500500000"]
SHA-256
7ea99444b4304f0557aa9a4dd8f1de2a559690d4a8d4c797928b40bcac9be115

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.