Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25GF0030

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25GF0030","CONSTRUCTION OF FLOOD MITIGATING STRUCTURE, MIAGAO TUMAGBOK RIVER, MIAGAO, ILOILO","GAA 2025 SSP","Completed",29555222.49,0,100,"Iloilo 1st DEO","Region VI","A.D. PENDON CONSTRUCTION & SUPPLY, INC. (FORMERLY: ADP CONSTRUCTION & SUPPLY) (3466)","2025-04-11","2025-10-14",2025,"Regular Infra - GAA 2025 SSP",10.64773,122.23721,"603030000","603000000"]
SHA-256
85248373723d3ba222fb86b227cfcfee82957effd464b4ce0d1fd72e58481dfb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.