Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25GK0040

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25GK0040","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUINDASCAN CREEK, CADIZ CITY, NEGROS OCCIDENTAL","GAA 2025 SSP","Completed",48509974.32,0,100,"Negros Occidental 1st DEO","Negros Island Region","SILVERGRACES CONSTRUCTION AND CONSTRUCTION SUPPLY (36158)","2025-04-08","2025-10-05",2025,"Regular Infra - GAA 2025 SSP",10.95691,123.21354,"1804504000","1804500000"]
SHA-256
e2000b3fc163afdc38d9c5f915232c478c511bfbf5af14b933e76bbfbbae7e95

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.