Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25GL0061

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25GL0061","CONSTRUCTION OF GUINTUBHAN RIVER BANK SLOPE PROTECTION STRUCTURE UPSTREAM (RIGHT BANK) OF GUINTUBHAN BRIDGE, BARANGAY 2, ISABELA, NEGROS OCCIDENTAL","GAA 2025 OO-2","On-Going",96500000,0,100,"Negros Occidental 2nd DEO","Negros Island Region","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2025-02-25",null,2025,"Regular Infra - GAA 2025 OO-2",10.19989,122.98033,"1804514000","1804500000"]
SHA-256
103b5be32bc15120ca4f3db1f5cace121949c49d22a204714468467144b63094

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.