Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25IA0007

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25IA0007","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE III, BARANGAY AGPANGI, NAVAL, BILIRAN","Flood Control and Drainage","Completed",14625710.46,0,100,"Biliran DEO","Region VIII","RMA BUILDERS & SUPPLIES CORPORATION (53055)","2025-02-26","2025-06-30",2025,"Regular Infra - GAA 2025 OO-2",11.59151,124.39965,"807808000","807800000"]
SHA-256
45af2718422393de37ace2c350ca3651d4b42731cced6301d31beeeb8a50bdd2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.