Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25IA0054

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25IA0054","CONSTRUCTION OF ARIQUIN FLOOD CONTROL STRUCTURE ALONG BILIRAN CIRCUMFERENTIAL ROAD, PHASE I, CABUCGAYAN, BILIRAN","Flood Control and Drainage","On-Going",48975848.49,0,100,"Biliran DEO","Region VIII","LCTING CONSTRUCTION AND DEVELOPMENT CORPORATION (FORMERLY: L.C. TING CONSTRUCTION) (23666)","2025-02-28",null,2025,"Regular Infra - GAA 2025 OO-2",11.47838,124.54015,"807803000","807800000"]
SHA-256
19e36736ba9f516533bc68187ad7aea35b61c975fb693b22b7186551e6bec61c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.