Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25IF0051

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25IF0051","CONSTRUCTION OF MISSING LINKS/NEW ROADS - JARO - RUBAS - ORMOC ROAD (ORMOC CITY SIDE), LEYTE","GAA 2025 OO-1","On-Going",144639688.89,0,100,"Leyte 4th DEO","Region VIII","COLLERA CONSTRUCTION (13246) / JM COLLERA KONSTRACT (42258)","2025-03-05",null,2025,"Regular Infra - GAA 2025 OO-1",11.10626,124.72821,"803738000","803700000"]
SHA-256
59ca9efe31000dda09114a1504a513712cf4e5a030e725f71bfacae0d0678845

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.