Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25IJ0005

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25IJ0005","OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GANDARA RIVER, PHASE II, BARANGAY HAMPTON, GANDARA, SAMAR","GAA 2025 OO-2","On-Going",43834399.82,0,100,"Samar 1st DEO","Region VIII","CDU CONSTRUCTION (13915)","2025-03-06",null,2025,"Regular Infra - GAA 2025 OO-2",12.10732,124.86089,"806007000","806000000"]
SHA-256
f30264d5d09c84f55fa1468dcdaf33751e55fa57e42e5366705de0d2adb5878f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.