Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25IJ0025

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25IJ0025","OO2: CONSTRUCTION OF FLOOD CONTROL STRUCTURE, PHASE III, BARANGAY TABAWAN, CALBAYOG CITY, SAMAR","GAA 2025 OO-2","On-Going",76683389.6,0,100,"Samar 1st DEO","Region VIII","CDU CONSTRUCTION (13915)","2025-03-06",null,2025,"Regular Infra - GAA 2025 OO-2",12.10426,124.61796,"806003000","806000000"]
SHA-256
01b39fc4467abd24fea623194d1b8ec2444f415b1d89173b71ff7f2793650239

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.