Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25JG0008

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25JG0008","FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DUMALIAN RIVER, PHASE II, BARANGAY DUMALIAN, SAN MIGUEL, ZAMBOANGA DEL SUR","GAA 2025 OO-2","Completed",48974569.28,0,100,"Zamboanga del Sur 2nd DEO","Region IX","NRMM CONSTRUCTION AND DEV'T CORP. (41172)","2025-02-19","2025-06-11",2025,"Regular Infra - GAA 2025 OO-2",7.72365,123.24181,"907324000","907300000"]
SHA-256
e5c74645628113b11a76441abb904c28687681266898ced5794842aeb9c80c06

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.