Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25JJ0023

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25JJ0023","REHABILITATION OF FLOOD CONTROL STRUCTURE ALONG MALAYAL RIVER, PACKAGE 1, BARANGAY MALAYAL, SIBUCO, ZAMBOANGA DEL NORTE","GAA 2025 OO-2","Completed",56163000,0,100,"Zamboanga del Norte 4th DEO","Region IX","R.B. MORALLO CONSTRUCTION (35159)","2025-03-14","2025-11-07",2025,"Regular Infra - GAA 2025 OO-2",7.21067,121.94597,"907216000","907200000"]
SHA-256
326653a079cc675aa5dab38c7d8ccda8ab679a7198436bd6e05fb556f17868d8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.