Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25KN0048

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25KN0048","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, (PULANGUI RIVER), PULANGUI RIS, VALENCIA CITY, BUKIDNON","GAA 2025 OO-2","On-Going",47473231.58,0,100,"Bukidnon 4th DEO","Region X","M. MONTESCLAROS ENTERPRISES, INC. (6506)","2025-03-26",null,2025,"Regular Infra - GAA 2025 OO-2",7.87369,125.20529,"1001321000","1001300000"]
SHA-256
6beb9c7ac90f63a25c2cde7367eb793e6ab6f92a5eefa4501c35b5df2149f102

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.