FY2026 GAA: ₱6.79T
PisoScan

Project 25OA0007

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25OA0007","CONSTRUCTION OF RIVERWALL ALONG TANZA DIKE (PHASE 5), BARANGAY TANZA, NAVOTAS CITY","GAA 2025 SSP","Completed",49499003.59,0,100,"Malabon-Navotas DEO","National Capital Region","CALCON ENGINEERING (39961)","2025-02-20","2025-07-21",2025,"Regular Infra - GAA 2025 SSP",14.68329,120.93276,"1380900000","1307500000"]
SHA-256
0afd5934fa532edb5cef45691d18890c223d061206f85896d5085c331d34d45f