Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25OA0045

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25OA0045","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG POLO RIVER (PHASE 4), MALABON CITY","GAA 2025 OO-2","Completed",61621870.54,0,100,"Malabon-Navotas DEO","National Capital Region","JUSTBILT BUILDERS (39754)","2025-03-19","2026-03-05",2025,"Regular Infra - GAA 2025 OO-2",14.67706,120.96434,"1380400000","1307500000"]
SHA-256
9ca21e3717a1649cedd72215face31724818f1bf74a8f102d6498a6fdf1f9b72

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.