Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25OD0001

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25OD0001","CONSTRUCTION OF DRAINAGE SYSTEM AND SIDEWALK ALONG MAYSAN SERVICE ROAD NLEX (PHASE IV), BARANGAY MAYSAN, VALENZUELA CITY","GAA 2025 OO-2","On-Going",19093428.04,0,68.43,"Metro Manila 3rd DEO","National Capital Region","TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)","2025-03-17",null,2025,"Regular Infra - GAA 2025 OO-2",14.69454,120.97874,"1381600000","1307500000"]
SHA-256
25ce5eea89111cd399be5380aecbbad3d9144fa6257e73d82a5be100056c4b68

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.