Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25OD0065

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25OD0065","REHABILITATION OF ROAD AND DRAINAGE ALONG DIZON ST., BARANGAY WAWANG PULO, VALENZUELA CITY","Roads","Completed",9634425.5,0,100,"Metro Manila 3rd DEO","National Capital Region","TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)","2025-03-17","2025-07-14",2025,"Regular Infra - GAA 2025 SSP",14.73144,120.92887,"301412000","301400000"]
SHA-256
7445f1feeb5734a1ed84b3dc7e9dd2c83a77a9e286153532a94230d00891329e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.