Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25PA0066

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25PA0066","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY PALAO, BANGUED, ABRA","GAA 2025 OO-2","On-Going",91668270.52,0,86.07,"Abra DEO","Cordillera Administrative Region","739 BUILDERS (31174)","2025-02-26",null,2025,"Regular Infra - GAA 2025 OO-2",17.5692,120.60889,"1400101000","1400100000"]
SHA-256
8d2f037faa6d7b2e46827522ed6df619b31a6edf87685f382ecabfe7f63c5cf9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.