DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25PA0070","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER PHASE I, BARANGAY CALABA, BANGUED, ABRA","GAA 2025 OO-2","On-Going",93648877.75,0,100,"Abra DEO","Cordillera Administrative Region","739 BUILDERS (31174)","2025-02-26",null,2025,"Regular Infra - GAA 2025 OO-2",17.59892,120.60032,"1400101000","1400100000"]
SHA-256
3c8f56d0ab255b05ede180b9b7f857d6441410a234ebfb55e3b7fd92d6a84cb4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.