Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25RE0003

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25RE0003","CONSTRUCTION OF ROAD, BARANGAY MACASILAO TO BARANGAY WINASWASAN, CALATRAVA, NEGROS OCCIDENTAL","GAA 2025 SSP","Completed",9790070.59,0,100,"Negros Occidental 5th DEO","Negros Island Region","RKVT CONSTRUCTION (54400)","2025-06-03","2025-09-30",2025,"Regular Infra - GAA 2025 SSP",10.68389,123.43583,"1804505000","1804500000"]
SHA-256
22abe0a014fa569eb15dd98f72712780b64aec9073375d487c44ea7c133622cb

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.