Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 26KB0038

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","26KB0038","CONSTRUCTION OF EVACUATION CENTER (COVERED COURT), BARANGAY POBLACION, KADINGILAN, BUKIDNON (124.909072', 7.599347')","Buildings: Construction - without Piles - Low Rise - Steel (Frame) (1 to 5 Storeys)","For Procurement",0,0,0,"Bukidnon 2nd DEO","Region X","",null,null,2026,"",null,null,null,"1001300000"]
SHA-256
dd739d96a258c7a4938f84eb7e59311c11297e7f4d8c4e6a5912698e8dffb31c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.