Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17CD0127

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17CD0127","RIPRAPPING / CONSTRUCTION OF RIVERWALL, UBIHAN, MEYCAUAYAN CITY, BULACAN","Flood Control: Construction - Slope Protection using non - structural measures (e.g. vetiver, coconet, other vegetation), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",1925260.75,0,100,"Bulacan 2nd DEO","Region III","C.L. MORALES CONSTRUCTION AND TRADING (38367)","2017-03-30","2017-06-27",2017,"Regular Infra - Flood Control: Construction - Slope Protection using non - structural measures (e.g. vetiver, coconet, other vegetation), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",14.75497,120.92117,"301412000","301400000"]
SHA-256
2c1e970a534f567ee693f8f6f9be28865051e0288e4959c59120955e5f199f3e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.