Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 17Z00004

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","17Z00004","REHABILITATION OF DIKE SYSTEM ALONG MADONGAN RIVER (BREACHED AND ERODED DIKE, LEFT AND RIGHT BANK), LAOAG RIVER BASIN FLOOD CONTROL AND SABO PROJECT","Flood Control: Construction - Channel Excavation, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)","Completed",862857754.67,0,100,"Flood Control Management Cluster","Central Office","TOKWING CONSTRUCTION, CORP.(FOR;  TOKWING CONSTRUC (9650)","2017-09-11","2020-12-23",2017,"Regular Infra - Flood Control: Construction - Channel Excavation, Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",18.08008,120.72764,"102809000","102800000"]
SHA-256
14c37e04780874784cb49d5d6793f485aec35c797df1bb9fe6895bb50697d543

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.