Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23HB0006

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23HB0006","ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM- ASSET  PRESERVATION PROGRAM -REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS BALILIHAN-HANOPOL-BATUAN RD - K0040 + (-493.50) - K","Roads","Completed",43118439.44,0,100,"Bohol 3rd DEO","Region VII","JAS MIXER CONSTRUCTION AND DEVELOPMENT CORPORATION (50738) / M.R. VARGAS CONSTRUCTION CORPORATION (FORMERLY: M.R. VARGAS CONSTRUCTION) (8215)","2023-02-10","2023-11-11",2023,"Regular Infra - GAA 2023 OO-1",9.8167,124.07536,"701213000","701200000"]
SHA-256
81d4abd9cb4573b19d101ae5455ee134115f96df11c29829589fca38e7c55a5c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.