Project 24M00011
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-24M00011",
"title": "CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION) PACKAGE K, TUPI, SOUTH COTABATO",
"sector": [
"Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP, Traffic Engineering and Management System (including Road Safety Devices)"
],
"status": "implementation",
"publicAuthority": {
"name": "DPWH Region XII"
},
"period": {
"startDate": "2024-06-10"
},
"budget": {
"amount": {
"amount": 192998545.87,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
124.91536,
6.33731
]
}
}
],
"parties": [
{
"name": "AMPLEX CONSTRUCTION AND SUPPLIES",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "24M00011",
"summary": {
"title": "CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION) PACKAGE K, TUPI, SOUTH COTABATO",
"status": "active",
"contractValue": {
"amount": 192998545.87,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "On-Going",
"physicalProgressPercent": 95.18,
"fundingSource": "Regular Infra - Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP, Traffic Engineering and Management System (including Road Safety Devices)",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "1ca5d2579ed85553608fde54b76b8df5879100e1bbf9f9f97f8b69b2a4d80076"
}
}