Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24M00011

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24M00011","CONSTRUCTION OF BY-PASS AND DIVERSION ROADS ALONG BANGA-TUPI-MALUNGON ROAD (TUPI-MALUNGON SECTION) PACKAGE K, TUPI, SOUTH COTABATO","Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP, Traffic Engineering and Management System (including Road Safety Devices)","On-Going",192998545.87,0,95.18,"Region XII","Region XII","AMPLEX CONSTRUCTION AND SUPPLIES (35090)","2024-06-10",null,2024,"Regular Infra - Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry), Roads: Construction - PCCP, Traffic Engineering and Management System (including Road Safety Devices)",6.33731,124.91536,"1206317000","1206300000"]
SHA-256
1ca5d2579ed85553608fde54b76b8df5879100e1bbf9f9f97f8b69b2a4d80076

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.