Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25C00350

DPWH infrastructure contract

This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON

{
  "id": "oc4ids-pisoscan-dpwh-25C00350",
  "title": "SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 1, SAN MIGUEL, BULACAN",
  "sector": [
    "GAA 2025 SSP"
  ],
  "status": "implementation",
  "publicAuthority": {
    "name": "DPWH Bulacan 3rd DEO"
  },
  "period": {
    "startDate": "2025-03-14"
  },
  "budget": {
    "amount": {
      "amount": 96499986.49,
      "currency": "PHP"
    }
  },
  "locations": [
    {
      "geometry": {
        "type": "Point",
        "coordinates": [
          121.054,
          15.005
        ]
      }
    }
  ],
  "parties": [
    {
      "name": "M3 KONSTRACT CORPORATION",
      "roles": [
        "supplier"
      ]
    }
  ],
  "contractingProcesses": [
    {
      "id": "25C00350",
      "summary": {
        "title": "SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 1, SAN MIGUEL, BULACAN",
        "status": "active",
        "contractValue": {
          "amount": 96499986.49,
          "currency": "PHP"
        }
      }
    }
  ],
  "pisoscan": {
    "dpwhStatus": "On-Going",
    "physicalProgressPercent": 84.81,
    "fundingSource": "Regular Infra - GAA 2025 SSP",
    "sourceDataset": "DPWH contract list via BetterGov.ph",
    "sha256": "5a5536abdcfe06cf1811ce4b4e591780e93c7dfaf9737955f1ef4e75279f952d"
  }
}