Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 25C00350

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","25C00350","SUSTAINABLE INFRA. PROJECTS ALLEVIATING GAPS (SIPAG)-SIPAG-FLOOD MITIGATION STRUCTURES PROTECTING PUBLIC INFRASTRUCTURES/FACILITIES-CONST. OF RIVERBANK PROTECTION STRUCTURE ALONG BALAONG RIVER (SITIO BROWN BRIDGE UPSTREAM), PACKAGE 1, SAN MIGUEL, BULACAN","GAA 2025 SSP","On-Going",96499986.49,0,84.81,"Bulacan 3rd DEO","Region III","M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)","2025-03-14",null,2025,"Regular Infra - GAA 2025 SSP",15.005,121.054,"301422000","301400000"]
SHA-256
5a5536abdcfe06cf1811ce4b4e591780e93c7dfaf9737955f1ef4e75279f952d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.